I would go with Option 2 myself (sorry Joe). The fuge will benefit from the raw over flow more. If you had to close off the T on on the return line to get the right return pressure, your fuge would be starved for water. The best of both world would be to devert (sp?) the overflow line as the major fuge feed and the then have the return shunt dump in there too.